Largest US grid operator was authorized to divert power destined for data centers to households to prevent rolling blackouts. An order by Energy Secretary Chris Wright authorized PJM Interconnection to direct data centers to switch on back-up generators to reduce their burden on the grid. Wait, why can't data centers not be a burden on the grid all the time? Or is generating AI slop an existential need?