EMT rails attached and bent. Roof is mostly finished. Will caulk between the panels at the end. I’ll bend identical conduits for the “sleds” so there are no fittings on the ground inhibiting dr...
Matt Hamilton profile picture
A 5 gal bucket of water and a battery + charge controller will be attached to the base of the tallest corners to mitigate typical wind.

When a hurricane or strong storm is coming I'll be moving these under tree cover and/or using earth screw anchors and chain to affix it to the ground so it doesn't blow away.
1
Matt Hamilton · 2w
Still need to add one more rigid brace before the frame is “done” (red). It started storming. But after looking at it, I might cut the frame-attached poles flush with the frame and then put the vertical supports inside so it appears more square and the roof provides an overhang. I thought usin...