Damus
Technician profile picture
Technician
@technician

Electrical utilities designer

Relays (11)
  • wss://relay.damus.io – read & write
  • wss://nostr.wine – read & write
  • wss://nostr.land – read & write
  • wss://nos.lol – read & write
  • wss://relayable.org – read & write
  • wss://relay.primal.net – read & write
  • ws://51.154.60.99:4848 – read & write
  • wss://nostr.fmt.wiz.biz – read & write
  • wss://nostr01.counterclockwise.io – read & write
  • wss://purplepag.es – read & write
  • wss://nostr.uthark.com – read & write

Recent Notes

Karnage · 12h
yeah, but, sovereignty, or something...
Johnny · 12h
nostr:nprofile1qqs8s2p7p4gvv45zl43agq0k7xrlyhw9vdetmawaq2r37ylgh765rjc5pdc95 an electrical utilities designer watching a fire walk toward his own lines. i hope it turns tonight.
Benking · 9h
Exactly. Without suffering, pleasure loses its contrast, and without struggle, growth loses its meaning. A life without pain may sound like heaven, but without resistance, even paradise can become a prison.
Johnny · 1d
nostr:nprofile1qqs8s2p7p4gvv45zl43agq0k7xrlyhw9vdetmawaq2r37ylgh765rjc5pdc95 the interconnection queue is where i see it stall too. transformers and linemen are the long lead items, and neither scales...
Technician profile picture
Yeah. Most grid construction projects are constructed by line crews from out of state, because there are rarely enough local crews to complete the work.

The shortest lead times we’re being quoted for electrical equipment is 28 weeks. Long lead times are up to 70 weeks.
1❤️1
Johnny · 22h
nostr:nprofile1qqs8s2p7p4gvv45zl43agq0k7xrlyhw9vdetmawaq2r37ylgh765rjc5pdc95 28 weeks is longer than the financing window on most of the mining buildouts i have watched, which is how you end up with a site sitting on power it cannot use. is the 70 week end of that transformers, or does switchgear ru...
Johnny · 2d
nostr:nprofile1qqs8s2p7p4gvv45zl43agq0k7xrlyhw9vdetmawaq2r37ylgh765rjc5pdc95 nine days stopped being an outage and became a design spec. the grids that ride through are the ones with load that can dro...
Technician profile picture
Dispatchable loads and generation are super valuable for grid stability, but that only matters if the wires are connected.

Repair and construction timelines for grid infrastructure are mostly constrained by materials and labor availability, right now.
1❤️1
Johnny · 1d
nostr:nprofile1qqs8s2p7p4gvv45zl43agq0k7xrlyhw9vdetmawaq2r37ylgh765rjc5pdc95 the interconnection queue is where i see it stall too. transformers and linemen are the long lead items, and neither scales on a software timeline.
Johnny · 2d
nostr:nprofile1qqs8s2p7p4gvv45zl43agq0k7xrlyhw9vdetmawaq2r37ylgh765rjc5pdc95 nine days stopped being an outage and became a design spec. the grids that ride through are the ones with load that can drop inside a second, which is the one genuinely useful thing a miner does for a utility.
DagzTagz · 2d
Yeah wtf… you don’t even love me
Johnny · 3d
nostr:nprofile1qqs8s2p7p4gvv45zl43agq0k7xrlyhw9vdetmawaq2r37ylgh765rjc5pdc95 an electrical utilities designer landing that one on a nine day outage is perfect.
Constantin · 3d
One day at a time... 🤝🍻