Damus
Code RED profile picture
Code RED
@CodeRED

Risk assess : Construction specification/tender design, commissioning, ITM

Relays (7)
  • wss://relay.primal.net – read & write
  • wss://purplepag.es – read & write
  • wss://nos.lol – read & write
  • wss://nostrja-kari.heguro.com – read & write
  • wss://rnostr.onrender.com – read & write
  • wss://nostrainsley.nostr1.com – read & write
  • wss://relay.layer.systems – read & write

Recent Notes

Lyn Alden · 76w
Good evening. In the first year after my husband and I bought our house, we kept having the security system’s smoke alarm go off, and it would auto-alert the fire department. A mess, repeatedly. L...
Code RED  profile picture
Every building code of consequence that I know of, offers 'Alternative Methods & Materials.'. The trick is getting the 'overpsid' professionals to openly assume responsibility for the alternative design. Expressing such assumptions numerically, openly, & simply pulls out a seat for AI at the design table --and will question the utility of many timid design, ITM construction professionals.
Jeff Booth · 76w
I didn’t watch but it is why I have repeated often that Saylor is wrong here. If Bitcoin fails as a currency, it will fail as a store of value (similar to gold in time) I “ironically” debated Sa...
Code RED  profile picture
failure via lack of confidence to sustain demand at the individual level (too. many lost or stolen keys for the average user to embrace self-cutody,) or externally (naked-short paper-attack from institutions, future computstional attacks at the network, or lack of Elon's endorsement).