captainslow
· 6d
https://i.poastcdn.org/1a/a7/14/1aa71478c515451f19a47796c0caa744347505368c3f05c33478b0f3999ae5ee.png
Okay so here's the question: Do these DCs plan on renting space and filling capacity over time, or do they not consider their work "complete" until they are filled with hardware owned by the DC owner.
If they're "AI datacenters", then one would presume the latter.
The low number is 65mn square feet. So the question is how much sub-10nm silicon (square meters) is required per square foot of datacenter?
And then the second question is how many square meters of sub-10nm silicon is the world producing?